Thursday, May 14, 2009
Concrete, pre-mixed, comes in fairly large minimum quantities. As the pool edge coping only needs a little, all of the landscaping pavers will be created by the Builder. Also, by reworking ground levels around the Pool Terrace, we have been able to delete almost 7 metres of balustrades and a stair (lots of materials and embodied energy), replacing it with two insitu concrete steps to the side garden, using more of the concrete load.
Colours are being tested out with VOC-free paints and renders.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment