The 3.2kW bank of photovoltaics is now on the roof and supplying power to the construction team during the day. This will provide all of the household energy needs and hopefully a surplus to sell back to the grid.Rainwater tanks have some water in them and a few of the stormwater gullies take the diverted, not-quite-warm-enough hot water back to the rainwater tanks for reuse (see the small black pipe behind the downpipe).
Ceiling fans are now installed and some of the compact fluorescent recessed downlights.Doors in solid hoop pine have been hung.