With blue skies and drier conditions, the roof is getting closer.
Some of the pipework (in PVC-free Geberit poly) and one low-flush toilet cisterns have been installed. We are still trying to negotiate with council a way of reducing pipework currently required by the need for separate dual supplies of greywater and rainwater to each toilet cistern.
Bluestone retaining walls are almost complete.