

One trailer load of non-reusable metal has been take to a recycler. All useful timber has been stockpiled at the rear of the site, protected by the old roofing iron. Only two 6m skips have been filled with non-recyclable/non reusable materials and taken to landfill.



No comments:
Post a Comment